PRODESA signed a contract with Dalkia Smart Building to provide a new drying line for Rayonier Advanced Materials Group in Tartas, in the southwest of France.

Prodesa belt dryer for Dlakia Smart Building - Rayonier Group

The 424 m2 belt dryer includes 13 heat exchangers and 8 large fans and is expected to be in operation in September 2020. The equipment will allow the recovery of 16 MW of hot water from the residual heat of the low temperature drying.

This is a major project for PRODESA that complies with both environmental requirements and the high demanding site operating conditions.

PRODESA FRANCE